SHIDE ENERGY / Storage & Ports

Storage & Ports

Zhanjiang Development Zone Shide Petrochemical Co Ltd connects its purpose-built oil depot with port facilities in Zhanjiang to support cargo receipt, storage, transit and onward shipment. The depot carries a 30-year right of use and supports the Group’s delivery arrangements across global markets.

GLOBAL TRADE / ZHANJIANG

Supporting global trade and cargo flows

Zhanjiang Development Zone Shide Petrochemical Co Ltd aligns storage and cargo transit with the international procurement and sales plans of Shide Energy Group Pte Ltd. Cargo characteristics, routes and vessel schedules inform port and onward transport arrangements, subject to applicable business scope and operator requirements.

01 / Tank farm

Purpose-built oil depot · 30-year right of use

Zhanjiang Development Zone Shide Petrochemical Co Ltd built the oil depot and holds a 30-year right to use it. The facility comprises 12 tanks with a total capacity of 200,000 m³, supporting the Group’s storage and cargo transit requirements. Use is arranged according to cargo type, storage duration and operating conditions.

200,000

Tank farm capacity

12

Diesel storage tanks

Shide tank farm

Tank configuration

Tank groups and capacities are shown below. Available capacity and operations depend on specific requirements. Cargo acceptance is subject to tank conditions, product compatibility and applicable licence scope.

Tank capacity breakdown
Tank numbersNumber of tanksCapacity per tankCombined capacity
101–108820,000 m³160,000 m³
109–112410,000 m³40,000 m³
Total12200,000 m³

Connected with Zhanjiang Port resources

The tank farm is located in the petrochemical storage area of Zhanjiang Port. Storage, port operations and onward transport can be coordinated around the Group’s cargo flows and delivery requirements.

110°23′37.8″ E
21°09′44″ N

Annotated location image of Shide Tank Farm at Zhanjiang Port

02 / Associated terminal facilities

Terminal technical information

Vessel suitability, berth allocation, operating windows and final acceptance are confirmed by the relevant operator.

Berth & transfer parameters
ParameterBerth 200Berth 210
Berth length470 m470 m
Depth at berth21.8 m22.8 m
Inner basin depth20.6 m22 m
Channel depth21 m
Maximum vessel deadweight
300,000 DWT
Discharge manifold
2 × 16 in
Maximum pump rate
9,000 m³/h/arm

Berth availability, vessel acceptance, draught limits and transfer rates are subject to final confirmation by the relevant operator for the proposed operation.

TERMINAL OPERATIONS

Port dangerous goods operations

Port dangerous goods operations at Zhanjiang Port Petrochemical Terminal Co., Ltd. cover designated areas. Scope and validity are subject to that operator’s current permit.

03 / ZHANJIANG PORT

Arrival, anchorage & pilotage coordination

Vessel arrivals require coordination with port scheduling, VTS and pilotage authorities. Anchorage, entry and departure times, and night navigation conditions are confirmed for the vessel and port requirements.

Discuss vessel arrival
Tanker at a coastal anchorage
Arrival coordination
We discuss arrangements in advance based on estimated vessel arrival and operating requirements.
VTS & pilotage
Follow local VTS and pilotage requirements using the latest information from the relevant authorities.
Anchorage & operating windows
Anchorage, berth allocation and operating times depend on port scheduling and actual conditions.

For arrival planning only. Use current port notices, charts and VTS/pilotage instructions for navigation and berth operations.

Discuss transit & storage cooperation

Tell us your cargo type, volume, cargo flow and schedule so we can discuss transit, storage and logistics arrangements for your trade.

Contact us